Validations of both Air & Water Systems. Intrusive Surveys carried out for both Pipework & Ventilation. Air & Water Balancing carried out In line with CIBSE and BSRIA codes of practice for every job we undertake and adhere to British Standards and CSA guidelines where appropriate.
Chlorination and sampling of External Mains and External Fire Hydrant Mains to the Local Authorities new mains SLO requirements. (We also have the option to get results back with a quick Turnaround to meet Connection Dates. · Chlorination of new building installation pipework carried out to BS8558 current legislation. · Chlorination of existing hot and
All pre-commissioning cleaning works are carried out to the guidelines set out in the BSRIA BG 29/2012 publication or, to the design criteria of the specific installation. Raw Water Flushing and Dosing of Heating & Chilled Water Systems. Chemical Cleaning and De-Scaling of Heating & Chilled Water Systems. Glycol Dosing. Regular Maintenance & Sampling of
Chlorination and sampling of new SLO mains water and hydrant water pipework to the utilities providers’ requirements. Chlorination of new building installation pipework to BS8558 current legislation. Chlorination of existing hot and cold water services to ACOP L8 Chlorination and cleaning of cold water storage tanks Chlorination of hot water calorifiers. Tank inspections. TMV inspection
We can accommodate the needs of all HVAC commissioning projects. Our works are in accordance with Part L Building Regulations, CIBSE guidelines and BSRIA application guides to meet current requirements and industry best practice: Pre-Commissioning Setting to Work Balancing and Regulation Environmental Checks and Tests Pressure Regimes and Airflow Direction Checks Sound Level Readings Clean
All pre-commissioning cleaning works are carried out to the guidelines set out in the BSRIA BG 29/2012 publication or, to the design criteria of the specific installation. The BSRIA BG 29/2012 “Pre-Commission Cleaning of Pipework Systems” outlines the methodology for the cleaning of new closed water systems. The guideline also illustrates design and installation requirements.