Chlorination and sampling of External Mains and External Fire Hydrant Mains to the Local Authorities new mains SLO requirements. (We also have the option to get results back with a quick Turnaround to meet Connection Dates.
· Chlorination of new building installation pipework carried out to BS8558 current legislation.
· Chlorination of existing hot and cold water services to ACOP L8
· Chlorination and cleaning of cold water storage tanks